Site Record Photos (Week at 18.12.2017 to 24.12.2017) |
 |
 |
 |
Finishing works at 4/F |
Installing of signage |
Painting/Plastering works for glass canopy at 1/F |
|
+ |
Site Record Photos (Week at 27.11.2017 to 3.12.2017) |
 |
 |
 |
Installing of netting at 5/F |
Dismantling of ceiling scaffolding at G/F |
Re-fixing of lighting at 4/F |
|
+ |
Site Record Photos (Week at 20.11.2017 to 26.11.2017) |
 |
 |
 |
Installing of timber door frame at 4/F |
Laying of floor tile at 2/F, lift lobby |
Finishing work for lift |
|
+ |
Site Record Photos (Week at 13.11.2017 to 19.11.2017) |
 |
 |
 |
Laying of screeding at 5/F |
Installation of false ceiling at 4/F |
Laying of wall tile at 4/F, Lift Lobby |
|
+ |
Site Record Photos (Week at 06.11.2017 to 12.11.2017) |
 |
 |
 |
Painting to hand railing at Staircase |
Installing of fan at classroom |
Installation of glass partition at G/F, Lift Lobby |
|
+ |
Site Record Photos (Week at 30.10.2017 to 05.11.2017) |
 |
 |
 |
Installing of glass balustrade at G/F |
External wall from G/F to R/F |
Installing of metal cover to window / metalwork at 2/F, classroom |
|
+ |
Site Record Photos (Week at 23.10.2017 to 29.10.2017) |
 |
 |
 |
Erecting of bulk head at 2/F, classroom |
Erecting/Grouting of glass balustrade at 1/F |
Dismantling of site hoarding |
|
+ |
Site Record Photos (Week at 16.10.2017 to 22.10.2017) |
 |
 |
 |
Erecting of timber frame at 2/F, corridor |
Laying of wall tile to column from G/F to 1/F |
Preparation work for concreting of floor screeding at 5/F |
|
+ |
Site Record Photos (Week at 09.10.2017 to 15.10.2017) |
 |
 |
 |
Glazing to Window |
Installing of lighting at 4/F, Multipurpose Studio |
Rendering to wall at 4/F, Lift Lobby |
|
+ |
Site Record Photos (Week at 02.10.2017 to 08.10.2017) |
 |
 |
 |
Dismantling of safety net |
Installing of metalwork/fin |
Laying of wall tiles from G/F to 1/F |
|
+ |
Site Record Photos (Week at 25.09.2017 to 01.10.2017) |
 |
 |
 |
Laying of wall tile at Corridor |
Painting to wall at classroom |
Laying of floor screeeding at Multipurpose Studio |
|
+ |
Site Record Photos (Week at 18.09.2017 to 24.09.2017) |
 |
 |
 |
Installing of 14’ fan |
Painting of External Wall |
Laying of Tile at Staircase |
|
+ |
Site Record Photos (Week at 11.09.2017 to 17.09.2017) |
 |
 |
 |
Dismantling of Steel Falsework |
Dismantling of Bamboo Scaffolding |
Laying of Screeding |
|
+ |
Site Record Photos (Week at 04.09.2017 to 10.09.2017) |
 |
 |
 |
Dismantling of Falsework |
Installing of window at Staircase |
|
+ |
Site Record Photos (Week at 28.08.2017 to 03.09.2017) |
 |
 |
 |
Painting to external wall |
Pointing to tiles at Swimming Pool |
|
+ |
Site Record Photos (Week at 21.08.2017 to 27.08.2017) |
 |
 |
 |
Classroom Mock-Up |
Laying Of Tiles in Swimming Pool |
 |
 |
|
Welding of metal works and laying of screeding at 5/F |
Touch Up the Plastering work at 4/F |
|
|